# The Case for Putting Skyscraper Data Centers on Nuclear Plant Sites

*Happy’s view, as he describes it: build tall data centers right on nuclear plant sites and run them as the plant’s own house load. No transmission line, no grid congestion charge, and secure, guarded rack space. He worked at Oyster Creek and interned at Fermi 2, so he knows what a plant’s internal electrical system looks like.*

The idea sounds almost too neat: a nuclear plant already has a giant generator, a switchyard, security fencing, and a skilled electrical staff. Why not stack a skyscraper full of servers inside the fence and feed it directly from the generator before the power ever touches the grid?

The short answer is that the electrical concept is real, but the regulatory and engineering details are messier than they first appear. The real-world test case—FERC’s November 2024 rejection of an expanded Amazon data center at the Susquehanna nuclear plant—shows both the promise and the problem.

## What “house load” actually means

Every power plant consumes some of its own electricity. Pumps, motors, control systems, cooling-water systems, safety instrumentation, lighting—all of that has to run whether or not the main generator is sending power to the grid. In the industry this is called **station service**, or **house load**.

The U.S. Nuclear Regulatory Commission describes the station service distribution system as the part of the plant’s electrical system that “supplies process and instrumentation loads within the plant.” It is split into normal power-production loads and safety-related loads, with multiple backup classes for emergency conditions. At a large light-water reactor, station demand is typically on the order of tens of megawatts—less than 75 MW for a 1,200-MW unit in many estimates. During normal operation the main generator can supply that load directly through a unit service transformer; if the generator trips, the plant transfers to off-site power or emergency generators.

So “house load” is not a marketing term. It is the plant’s own critical auxiliary load. It is also not designed to be a giant, profit-making customer.

## The difference between house load and a co-located data center

This is where Happy’s idea needs a precise distinction.

A data center on a nuclear site would not literally become part of the plant’s safety-class station service load. It would be a **co-located load**—an end-use customer physically connected to the generating facility’s side of the point of interconnection, rather than to the transmission grid.

PJM, the grid operator for the Susquehanna case, defines a co-located load that is **“behind the meter”** as one connected to the generating facility but only indirectly connected to the grid through the generator’s interconnection facilities. By contrast, a load **“in front of the meter”** is directly interconnected to the grid.

That behind-the-meter position is the source of the economic appeal. If the data center takes power directly from the generator before it is sold into the wholesale market, it may avoid transmission charges, capacity charges, and some ancillary-service costs. The generator also gets a customer that is not exposed to grid congestion. And because the data center sits inside a nuclear security perimeter, it inherits guarded rack space that most commercial data centers have to build from scratch.

But it is not the same as house load. House load is the plant’s own auxiliary consumption. A co-located data center is a separate commercial load that happens to sit on the generator’s side of the meter. That distinction matters to regulators, because the cost and reliability rules are different.

## The real test case: Susquehanna, Amazon, and FERC’s November 2024 rejection

The closest real-world example is the Susquehanna nuclear station in Pennsylvania, a 2,520-MW two-unit plant owned by Talen Energy. An Amazon Web Services data center campus was already co-located behind the meter under an earlier arrangement.

In 2023, PJM and FERC accepted an amended interconnection service agreement that allowed **300 MW** of co-located load at Susquehanna—150 MW behind each unit. That arrangement came with protections: the data center would separate from the plant if on-site generation was lost, so that no power would flow from the transmission system to the data center.

Then PJM filed an amended ISA in June 2024 to increase the co-located load from **300 MW to 480 MW**. The data center was still not intended to take power from the PJM grid; the generator would supply it directly. PJM determined the expansion would not have a material impact on the transmission system.

On **November 1, 2024**, FERC rejected the amended agreement by a **2–1 vote** (Commissioners Christie and See in the majority, Chairman Phillips dissenting). FERC did not say co-location is categorically forbidden. It said PJM had not justified the proposed deviations from its standard interconnection agreement—a procedural ruling with substantive undertones. FERC suggested that PJM should instead file region-wide tariff revisions to address behind-the-meter load arrangements, including reliability and cost-allocation issues.

The protests that drove the case are instructive. Exelon and American Electric Power argued that the Amazon data center could avoid transmission costs of **up to $140 million per year**, shifting those costs to other PJM customers. They also pointed to unplanned outages at Susquehanna that had led to unintended power withdrawals from the grid, raising questions about metering and billing if the data center ever did draw from the system.

In other words, the objection was not that the electrons cannot physically flow from the generator to the data center. The objection was that a large behind-the-meter load can receive grid-backed reliability benefits—and create grid reliability obligations—without paying its share of the transmission system that makes those benefits possible.

## What this means for Happy’s skyscraper idea

Happy’s instinct is directionally correct: a nuclear site has the generator, the switchyard, the security, and the electrical infrastructure to support a very large on-site load. A tall data center on that site could, in principle, be served behind the meter and avoid the transmission line and congestion charges that dominate new data-center siting.

But the Susquehanna case shows three hard constraints.

**First, “house load” is the wrong legal category for a commercial data center.** Regulators will treat a 300–500 MW data center as co-located load, not as station service. That means it needs an interconnection agreement, protection schemes to separate it from the plant during outages, and a cost-allocation framework. FERC’s November 2024 order says those issues should be handled through a grid operator’s tariff, not through one-off amendments.

**Second, the cost-shifting argument is powerful.** If a data center avoids transmission charges by sitting behind the meter, other ratepayers may still be paying for the grid that backs up the generator and the data center during maintenance or outages. FERC did not fully resolve that fairness question in November 2024; it punted it to a future PJM tariff filing.

**Third, nuclear safety and commercial load do not mix casually.** A plant’s station service system is designed around safety-grade redundancy and load-shedding priorities. A skyscraper data center would be a large, non-safety load that has to be cleanly separable when the plant trips. The existing Susquehanna arrangement included exactly that kind of protection: the data center separates if on-site generation is lost. Any serious proposal would need the same.

## The bottom line

Happy’s idea is not fantasy. Co-located, behind-the-meter load at nuclear plants is real, and the economic logic—no long transmission line, no congestion charge, secure site—is exactly why Amazon, Talen, and others pursued it.

But the FERC case shows that the regulatory system is not yet ready to treat a skyscraper data center as ordinary house load. The plant’s own station service is a safety and operations matter; a commercial data center is a wholesale-market and cost-allocation matter. Until grid operators write tariffs that separate the two cleanly, the “nuclear plant as data-center host” model will remain promising but legally unsettled.